Make an enquiry

Package solution

Blinds Manufacturers Software

More traceability of production capacity and process with less time and manpower

In the highly competitive window and blinds manufacturing industry, precise management of orders, schedules, and resources is key to a successful business. Our window frame software is specifically designed to streamline complex production processes, reduce required time and human resources, while ensuring full traceability and control over every stage of the work.

 

More Control and Traceability of Production Capacity and Processes

 

Through the integrated platform for managing window frame and blinds production, you have the opportunity to optimize coordination between teams, automate pricing, and plan the production schedule with minimal errors and maximum efficiency. This leads to faster order completion and increased customer satisfaction.

 

Book a slot for a call

It takes less than a minute

Book a slot for a call

Main Challenges

 

 

1. Team Coordination for Measurement Collection


The work of multiple employees who visit different locations daily requires precise organization. Poor management often leads to missed opportunities, confusion, and stress within the team.

 

2. Complex and Specific Pricing


For window frames, there are clear pricing parameters, but with blinds and insect screens, factors such as fabric category, sizes, additional features, and discounts make the process difficult to manage manually. This creates a risk of errors that reduce profitability.

 

3. Production Scheduling and Deadlines


The dynamic requirements related to advance payments and production capacity make manual scheduling (e.g. using Excel) inefficient and slow.

 

4. Installation and Construction Activities


These tasks are part of the overall order fulfillment, especially during peak seasons. Tracking and documenting them without specialized software further burdens the team and increases the risk of omissions.

 

 

Why Choose Our Window Frame and Blind Manunacturer Software?

 

 

1. Time Savings and Minimal Human Resources


The system allows data entry only once — from the quote, through the order, production order, to installation protocols. This eliminates redundant work and accelerates the entire process.

 

2. Reducing Errors and Missed Opportunities


Automated pricing for blinds, blinds quoting software, insect screens, and windows based on your rules and price matrices minimizes the risk of inaccuracies and lost potential profits.

 

3. Increased Productivity and Control Over Schedules


Tracking the stages of measurement, production, and installation with the ability to make easy adjustments ensures optimal use of resources and reduces team workload.

 

4. Business Expansion and More Potential Customers


The distributor management module allows for efficient management of partner relationships and growth of the client network and serves as an excelent crm for blinds manufacturers.

 

5. Increased Revenue through Integration with Production Systems


Connecting with window frame and glazing systems frees employees from routine tasks and directs them toward business development.

 

 

What Makes Our Window Frame Software an Essential Tool for Your Business?

  • Intuitive and Easy-to-Use Interface, tailored to the specifics of your production.
  • Automatic Document Generation, reducing administrative duties.
  • Detailed Reporting and Analytics for the entire production process.
  • Support for Multiple Users with flexible user rights management.
  • Mobile App for Field Teams, enabling direct communication and real-time information updates.

 

 

Choose Our Window Frame and Blind Manufacturer Software and optimize the management of your blinds and window frame production. Save time, reduce errors, and increase profits with an intelligent solution designed especially for you.

Package Prices

We offer ready-to-use solutions for your business at a fair price. These solutions come with a monthly fee, which includes hosting and data backup, 2 hours of support and software updates.

Basic

€400

per month (no VAT incl.)

5 licenses

+ €40 for an additional license

+ €1800 one-time fee

  • 5 modules
  • Hosting
  • Data Backup
  • Support - 2 hours per month
  • Software Updates
Get Basic
Standard

€425

per month (no VAT incl.)

5 licenses

+ €45 for an additional license

+ €2300 one-time fee

  • 9 modules
  • Hosting
  • Data Backup
  • Support - 2 hours per month
  • Software Updates
Get Standard
Custom

Contact us for personalized offer

Personalized

  • Additional modules
  • Multiple licenses
  • Integration with multiple systems
  • Training
  • Premium support
Make an enquiry

Modules

Basic

Standard

nZoom+

Trade Process

It allows storing a database of clients, entering inquiries from potential or existing customers, and tracking their progress towards an offer/contract/order. Creating and printing offers and contracts/orders from the system with automatic calculation of price quotes for all products offered by the company, such as blinds/mosquito nets, based on product type, dimensions, and customer type (distributor or end customer). Storing information about the status of the inquiry - whether the dimensions have been taken, when the installation will be done. There is also a functionality for "Managing Relationships with Distributors," which enables the generation of different price lists for each distributor, along with their applicable discounts and bonuses.

Schedules for Activities Planning and Tracking

  • A schedule for taking measurements with the ability to graphically track the workload of the measurers, an automatic suggestion from the system for the time to take measurements based on the products that need to be taken from the customer.
  • The system can also generate contracts/orders by the measurer and record payments. A daily schedule of measurements can be printed, providing the measurer with addresses, phone numbers, agreed-upon times, and tasks for each day.

Finances

  • A system for calculating and tracking the balances, deposits, and bonuses of contractors that are calculated during the entry of contracts/orders.
  • Financial management of the company, including issuing and recording primary accounting documents (revenues and expenses), managing cash flows, bank accounts, and more.
  • It allows for the automatic posting of paid advances and adjusts the deposit amount when the order is modified.
  • It covers and monitors the entire cash flow of the company, recording payments made by customers, distributed by orders.
  • It enables the generation of reports on cash flow, structured information about the revenue and expense parts by products, and the generation of data on the financial profitability of the company.

Storage Management

It allows the sale of individual items that are not associated with and, therefore, not included in the production of windows and doors, in the sales inventory, and their automatic removal from the inventory.

Production

  • Management of the production process involves planning the production of different types of items based on the completion deadlines for individual orders/contracts. 
  • It includes generating production requests from contracts/orders. 
  • It allows for setting the capacity of individual departments and tracking their workload. 
  • It also provides the capability to mark on the production schedule whether a specific product has been manufactured or not.

Delivery Schedule

The system supports a delivery schedule for finished products/completed orders that need to be delivered to specific customers/distributors. Delivery requests are created automatically based on the order deadlines, and there's an option to predefine the transportation means with their specific capacity based on the type/product (blinds, windows, mosquito nets, etc.).

Human Resources

It provides calculation of additional compensation for employees, maintains a database of employee records, manages employee leaves, provides reports on employee absences, offers an electronic form for submitting and approving business trips, and supports work shift schedules.

Inventory and Vehicles

  • It allows you to register all the company's vehicles and their details. 
  • It generates repair requests that need approval. 
  • It enables the creation of a complete analysis of expenses incurred for each vehicle. 
  • It includes an "Inventory" and "Personal Protective Equipment" function that allows for the creation of inventory files and a separate nomenclature for Personal Protective Equipment (PPE) items that are included in the PPE inventory.

Installation

  • It can manage the installation process of the finished product by means of installation requests to be automatically generated from orders/contracts according to their progress.
  • It can form teams and allocates a budget for consumables for the various assembly activities of the individual products.
  • It can follow-up the installation process of finished orders and their reporting by means of Protocols for completed installation.

Internal Communication and Coordination

An internal information board that publishes various types of messages to employees and assigns tasks to them. Using a unified calendar throughout the organization, meetings, commitments, tasks, regular events, and minutes of meetings are tracked.

€400

per month (no VAT incl.)

5 licenses

+ €40 for an additional license

+ €1800 one-time fee

Get Basic

€425

per month (no VAT incl.)

5 licenses

+ €45 for an additional license

+ €2300 one-time fee

Get Standard

€450

per month (no VAT incl.)

5 licenses

+ €50 for an additional license

+ €3000 one-time fee

Get nZoom+

nZoom Client Testimonials

България Пласт - фирмено лого

“Out busiest employee is now free and available.”

Manager

Mariya Ivanova

Clients Who Have Already Trusted Us